General contractor or construction firm

Free Construction Proposal Template

A free construction proposal template with phased pricing, a scope of work, payment milestones, and terms you can edit and send for signature.

Talk to us about this template
Atlas Build Co.
Proposal / Jul 30, 2026
Prepared for Meridian Properties

Commercial Renovation Proposal

A full-scope commercial renovation covering pre-construction planning, structural work, interior build-out, and punch list closeout for a mid-size retail space.

The engagement
Substantial completion within 16 weeks of notice to proceed
16 weeks
Prepared for
Taylor Dunn
VP Development, Meridian Properties
Valid through
30 days
01Executive summary

Why now.

Meridian Properties is converting a vacant mid-size ground-floor unit into a tenant-ready retail space, requiring demolition of the existing layout, structural reinforcement, new mechanical and electrical rough-ins, and a complete interior build-out to shell-plus specification. Atlas Build Co. will deliver the renovation through a phased program covering pre-construction, structural work, build-out, and a formal punch list closeout, keeping the adjacent tenants operational throughout.

02Business case

The problem & solution.

The Challenge

The ground-floor unit has sat vacant for fourteen months because its aging layout, outdated mechanical systems, and lack of modern code compliance make it unleasable to the retail tenants Meridian is targeting.

Solution Overview

A phased renovation that demolishes the existing interior, reinforces the structure where needed, installs new mechanical, electrical, and plumbing rough-ins, and delivers a finished shell-plus space ready for tenant fit-out.

Success Metrics

  • Schedule adherence
    Current
    Vacant, no renovation underway
    Target
    Substantial completion within 16 weeks of notice to proceed
  • Code compliance
    Current
    Multiple code deficiencies on record
    Target
    Full certificate of occupancy issued by the authority having jurisdiction
  • Tenant disruption
    Current
    Adjacent tenants operating normally
    Target
    Zero unplanned closures or access interruptions to neighboring units
03Approach

How we engage.

Methodology
The project follows a design-bid-build sequence compressed into four phases. Pre-construction locks down permits, subcontractor bids, and a detailed construction schedule before any demolition begins. Structural and rough-in work runs next, followed by the interior build-out. A formal punch list walk and handover close the project with documented sign-off.
Description

A phased renovation program with weekly owner updates, a shared construction schedule, and formal milestone sign-offs at each phase gate.

Client Dependencies

  • Approved architectural and MEP drawings before notice to proceed
  • Building access and coordination with property management for adjacent-tenant logistics
  • Timely owner decisions on finish selections and change orders (5 business days)
  • Permit application fees and any owner-furnished fixtures or equipment
04Scope of work

What's in & out.

In Scope

  • Selective demolition of existing interior partitions, ceiling grid, and flooring
  • Structural reinforcement per the engineer's report, including header replacements and column wraps
  • Mechanical, electrical, and plumbing rough-in to shell-plus specification
  • Interior build-out: drywall, ceiling, flooring, storefront glazing, ADA-compliant restrooms, and finishes
  • Final inspections, punch list resolution, and certificate-of-occupancy coordination

Out of Scope

  • Architectural and engineering design (owner-furnished drawings)
  • Tenant-specific fit-out beyond shell-plus specification
  • Exterior facade work, roofing, and site improvements
  • Furniture, fixtures, and equipment procurement
  • Hazardous material abatement (if discovered, handled as a change order)

Success Prerequisites

  • Stamped construction drawings and permits in hand before mobilization
  • Structural engineering report reviewed and accepted by both parties
  • Adjacent-tenant notification and access schedule agreed with property management
05Deliverables

What you'll receive.

  1. 01
    Pre-construction package

    Permit filings, subcontractor awards, construction schedule, and a site logistics plan covering adjacent-tenant protection.

    Week 3
  2. 02
    Foundation and structural completion

    Demolition complete, structural reinforcement installed and inspected, and all rough-in work (mechanical, electrical, plumbing) passed inspection.

    Week 8
  3. 03
    Interior build-out

    Drywall, ceiling, flooring, storefront glazing, restrooms, and all interior finishes installed per the approved drawings.

    Week 14
  4. 04
    Punch list resolution and handover

    Formal punch list walk, all items resolved, final inspections passed, certificate of occupancy obtained, and as-built drawings delivered.

    Week 16
06Engagement plan

Phases, deliverables, allocations & dates.

Total
$85,000
Duration
16 wks
Phases
4
Start
Aug 4, 2026
End
Nov 17, 2026
TIMELINE
DELIVERABLES & PHASE ALLOCATION
Phase
Deliverables
Allocation
01
Pre-construction
Wk 1-3 · 3 wks
  • ·
    Pre-construction package
$12,000
Manual
02
Foundation and structural
Wk 4-8 · 5 wks
  • ·
    Foundation and structural completion
$30,000
Manual
03
Build-out
Wk 9-14 · 6 wks
  • ·
    Interior build-out
$35,000
Manual
04
Punch list and handover
Wk 15-16 · 2 wks
  • ·
    Punch list resolution and handover
$8,000
Manual
Total
4 deliverables · 4 phases · 16 wks
$85,000
07Investment

Fees & schedule.

Total Investment
USD85,000
Pricing Model
Fixed
Engagement Term
Aug 4, 2026 – Nov 17, 2026 (16 weeks)
Payment Terms

Net 15

Expense Policy

All materials and subcontractor costs are included as priced. Owner-requested changes or unforeseen conditions are documented as change orders, pre-approved in writing, and billed at cost plus the agreed markup.

Fees

01
Pre-construction planning and permitting

Permit filings, subcontractor procurement, construction scheduling, and site logistics planning.

One-Time
$12,000.00
02
Foundation and structural work

Selective demolition, structural reinforcement, and mechanical, electrical, and plumbing rough-in with inspections.

One-Time
$30,000.00
03
Interior build-out and finishing

Framing, drywall, ceiling, flooring, storefront glazing, ADA-compliant restrooms, and all interior finishes.

One-Time
$35,000.00
04
Punch list, inspection, and handover

Formal punch list resolution, final inspections, certificate of occupancy coordination, and as-built drawings.

One-Time
$8,000.00

Payment Schedule

01
On contract signing
25
$21,250.00
02
Foundation and structural complete
30
$25,500.00
03
Build-out substantially complete
30
$25,500.00
04
Final handover and certificate of occupancy
15
$12,750.00
08Qualifications

Why this team.

Team Members

Jordan Hale
Project Director

Owns the client relationship, schedule, and budget across all project phases.

Priya Sandoval
Site Superintendent

Manages daily field operations, subcontractor coordination, and quality control on site.

Case Studies

Mixed-use retail center

Renovated three ground-floor retail units while the upper-floor office tenants remained operational.

Delivered on schedule with zero tenant complaints and full code compliance on first inspection.
Historic downtown commercial building

Converted a 1960s office floor into modern retail shell space, including structural upgrades and a new storefront system.

Completed within budget and two weeks ahead of the lease-commencement deadline.

Differentiators

  • Phased construction approach that keeps adjacent tenants operational throughout
  • In-house superintendent on site daily, not just at milestone inspections
  • Transparent weekly cost and schedule reporting with no surprise change orders
09Risks

What could go wrong.

Risk
Hidden conditions discovered during demolition (asbestos, structural deficiencies)
Mitigation
A pre-demolition survey is included in pre-construction. Any unforeseen conditions are documented and priced as a change order before work proceeds.
Risk
Permit delays push the schedule
Mitigation
Permit applications are filed in the first week of pre-construction with expedited review requested. The schedule carries a one-week float before structural work begins.
Risk
Adjacent tenant disruption from noise or access conflicts
Mitigation
A site logistics plan and tenant notification schedule are established during pre-construction. Noisy work is confined to agreed hours.
10Terms

The fine print.

Proposal Validity
30 days
MSA Reference

This proposal may be incorporated into a separate construction agreement if the parties choose to execute one.

IP Ownership

All architectural and engineering drawings remain the property of their respective designers. Atlas Build Co. will deliver as-built drawings upon project completion. Atlas Build Co. carries commercial general liability, workers' compensation, and builder's risk insurance, with certificates available on request.

Termination Clause

Either party may terminate with 14 days written notice. In the event of termination, the owner pays for all work completed and materials procured through the termination date, plus reasonable demobilization costs. Retainage on completed phases is released within 30 days of termination.

What's inside this free construction proposal template

This construction proposal template is a complete, editable example for general contractors and construction firms scoping a commercial renovation or new build. It covers pre-construction planning, a phased build schedule, itemized pricing with milestone payments, and terms for change orders, insurance, and project closeout.

  • Pre-construction scope: site assessment, permitting, and submittals
  • Phased build timeline with milestone deliverables
  • Itemized pricing broken down by construction phase
  • Change order process and approval requirements
  • Insurance, bonding, and warranty terms

How to use this construction proposal template

Preview the full example above, then open it in InkDraft to make it yours. Replace the sample project with your actual scope, adjust the phasing and pricing, and set the payment milestones. When the proposal reads the way you want it, send it for review and signature or export a PDF.

Template questions

What should a construction proposal include?

A strong construction proposal covers the project scope and specifications, a phased timeline (pre-construction, build, punch list), itemized pricing with payment milestones, insurance and bonding details, and terms for change orders and termination.

How do you price a construction proposal?

Break the total into phases tied to measurable milestones: site prep, structural, build-out, and handover. Fixed-price with progress payments is the most common model for commercial work because it makes cash flow predictable for both sides.

How do change orders work in a construction proposal?

A change order is a written amendment to the original scope and price. The proposal should require change orders to be approved in writing before the work begins, with a clear process for pricing the change and adjusting the schedule.

Should a construction proposal include insurance requirements?

Yes. Commercial general liability, workers' compensation, and builder's risk insurance are standard. The proposal should state who carries each policy and require certificates of insurance before work begins.